Friday, 7 December 2012

3d parts

As I want to lost wax cast a lot of the parts for the Class 70 bogie assembly, it made sense to get the master parts for the external detail 3d printed.

Here are some of the suspension parts 3d printed ready to make silicone moulds from. These have been scaled up to allow for metal shrinkage in the casting process. I had these printed by 3dprintuk and I think they have come out very well. Turn around time was only a few days once the files were finalised. The only hitch came when the post office lost them. Still they found them in the end and the parts turned up ok a couple of days later. These were printed on an Objet machine using a printable photo polymer process. This in my opinion gives much better resolution and surface quality than some of the other technologies in common use.

Gearbox for 5" wheelset

This shows the general arrangement of the gearbox. This uses ball and needle roller bearings throughout with the gears being keyed to shafts where necessary. The intent is that the grars will be all steel and the whole thing will be grease packed for life. The ratio used is 8:1 giving around 10mph max speed. It could be geared lower but the motor doesnt need it.

5" Gauge wheelset

This is the arrangement for the wheel set. I'm quite please with it at this stage, I just need to make one up now to test. As these can go under any external frame 5" bogie, I can test them on one of my other locos.
I have been working away on various bits of the design for the Class 70, mainly on the Bogie design.

I have decided to custom make the wheel sets for this as I like the idea of plenty of power combined with a fully enclosed gearbox. That means a modified motor and complete fabrication of the gearbox assembly.

This is what I have to date. The funny breaks are where the various sections on the bogie frame will be welded together. I intend to use a fair bit of lost wax casting on this project, hence casting in the weld prep where I want it.

Interestingly from my calculations so far, although this is drawn as a 3 motor set up, the 3rd motor adds no real benefit. If 2 motors can produce more power than can be put down onto the track then adding a 3rd actually reduces the tractive effort available to pull away. I have drawn it as a 3 motor setup mainly to confirm that if needed, a 3rd motor can be added. As it stands, the centre axle will probably be free wheeling and very lightly sprung so that the weight falls on the power producing axles at the end of the bogie.

Sunday, 21 October 2012

I have now added the first rough models for the bogies. These have a fair bit of work in them so far as I had to sort out the arrangements for the motors and axle gear boxes. It's nice to get a better impression of what the overall model will look like. I think the next stage might be a first draft of the chassis.

Saturday, 13 October 2012

New Project: Class 70 Locomotive in 5" gauge


I am currently working on a 5" gauge model of this.

It's a Powerhaul class 70 locomotive made by GE.


I am drawing it up using Solidworks before cutting metal. The complex body shape certainly makes it a challenge.

This still needs a lot of detail adding but it gives the general impression of what is  involved.

Friday, 31 December 2010

Coolant Guard for Bridgeport Clone CNC Milling Machine

Once I had the machine home, I really wanted to be able to use flood coolant rather than a mist or spraying from a bottle.

This was my first mod to the machine, and meant that I could really push the coolant in there. I find the flood coolant is as useful for blasting the chips clear of the cutting area as for keeping the cutter cool.

The coolant enclosure underhangs the front of the table by about 225mm and the underhang slopes down by just over 25mm from right to left so that the coolant naturally drains to one side. The original table drains are retained and the new one on the enclosure all run back to an external coolant tank.

The front centre panel lifts out for access to the work area.

Construction is Aluminium with 5mm polycarbonate for all the vision panels. The upper frame is all extruded channel material and very quick and handy to use.

The rubber curtain at the back is really handy as it contains most of the coolant heading that way. For setups with longer tooling or higher work pieces, I have a second piece of the rubber available to be put in place as required.

At this stage, I did away with the interlock switch from the old guard system and I could in theory run the machine with the front panel out of place, but why would I, It just winds up with swarf and coolant everywhere.

I guess with thinking it out and then putting it together, it was probably a couple of days of work but spread out over maybe 6 weeks or so.